Üretim Akışı

raw material
raw material
injection molding
Caster injection molding
Stamping
The first step of metal material processing is to use the mold and machine to press out the caster mounting plate, arm and ball plate
rivet
The ball, ball plate, bottom plate, and arm are riveted together with large rivets to make a complete caster bracket
assembly
The single wheel and bracket are assembled with bearings, shaft tubes, screws and nuts, etc., to obtain complete casters

Üretim Ekipmanı

Ad
Hayır
Miktar
Doğrulandı
Auto stamping line
/
3
Injection molding machine
/
5
laser machine
/
1
riveting machine
/
4
numerical control machine
/
2
lathe
/
2
Doğrulandı

Fabrika Bilgileri

Fabrikanın Büyüklüğü
3,000-5,000 square meters
Fabrikanın Bulunduğu Ülke/Bölge
101, Building C24, Huachuang Animation Industrial Park, Jinshan Village, Shiqi Town
Üretim Hatlarının Sayısı
6
Sözleşmeli Üretim
OEM Service Offered, Design Service Offered, Buyer Label Offered
Yıllık Çıktı Değeri
US$5 Million - US$10 Million

KALİTE KONTROL

Test Ekipmanı

Makine Adı
Marka ve Model NO
Miktar
Doğrulandı
Walking load test machine
/
1
Salt spray test machine
/
1
Load bearing testing machine
/
1